Everett Street Corridor Improvements—NE 35th Avenue to NE 43rd Avenue
Share Everett Street Corridor Improvements—NE 35th Avenue to NE 43rd Avenue on Facebook
Share Everett Street Corridor Improvements—NE 35th Avenue to NE 43rd Avenue on Twitter
Share Everett Street Corridor Improvements—NE 35th Avenue to NE 43rd Avenue on Linkedin
Email Everett Street Corridor Improvements—NE 35th Avenue to NE 43rd Avenue link
Updates
- May 21, 2026: Thank you to the 100+ attendees who joined us at the lodge for our first open house! For a look at the presentation, including 3D flyover and traffic-flow videos, click here. The evening included:
- Learning about the project and design process,
- A group question-and-answer session,
- Stations for talking with team members and viewing materials, and
- Sampling food from Shorty's Barbecue, a Camas small business.
- May 1, 2026: Please join us for an open house on Wednesday, May 20, 6-8 pm, at Lacamas Lake Lodge, to hear about the project and design process. Your participation and feedback are essential!
- February 20, 2026: The SR-500 / Everett Street Corridor Project is progressing through design and is anticipated to reach approximately 60% design within the next one to two months. As design advances, staff will begin a more focused phase of public outreach in April and May, including engagement with potentially impacted residents to share preliminary concepts and discuss anticipated project impacts.
- November 11, 2025: Attention! Contractors with Apex Companies will be working on utilities along NE Everett (SR500) between NE 35th and NE Leadbetter, Monday, Dec. 1. Please note this work could cause traffic delays. Workers will be present, so please use caution in the area. When available, please use an alternate route.
- October 14, 2025: Land surveying is complete for now. Additional survey may be needed as the design progresses.
- March 24, 2025: Land surveyors have begun performing site investigations in the area. Affected residents received a notice on their door.
Purpose
This project will complete street and frontage improvements between NE 35th Avenue and NE 43rd Avenue for greater safety, accessibility, and mobility. It is the first phase of improvements for the broader Everett Street (SR 500) Corridor, which has been identified in the City of Camas’ comprehensive and transportation planning documents for many years.
Community Involvement
- There will be multiple ways for the community to offer input on this project phase.
- Opportunities will be posted here and publicized broadly when details are in place.
- To learn how public feedback gathered in the first stage of the project is helping to guide this one, please visit engagecamas.com/everett-street-corridor-analysis.
Key Features
- The existing roadway has 2 lanes and is approximately 20 feet wide.
- There are discontinuous shoulders of varying width on both sides of the road, intermittent roadside parking, no pedestrian or bicycle facilities, and multiple Clear Zone obstructions.
Anticipated Improvements
- Stormwater conveyance and treatment infrastructure
- Concrete curb and gutter
- Retaining walls
- Planter strips
- Bicycle and pedestrian facilities on both sides of the road
- Roadway illumination
- Roundabouts at NE 38th Avenue and NE 43rd Avenue
Budget and Funding
- Based on the most recent project information, as of May 1, 2026, the following is a breakdown of estimated project costs:
- $2.2M Design Funding: 75% Local & 25% Federal (SECURED)
- $1.2M Right of Way Funding: 16% Local & 84% Federal (SECURED)
- $20M +/- Construction Funding: % Unknown, Pending Grants (IN PROGRESS)
About the Corridor
- The corridor is approximately 1.3 miles long.
- It stretches from the Lake-Everett Roundabout to the northerly city limits.
- The corridor is anticipated to be split into multiple projects over several years.
- Not only is it a state highway (SR 500), but it is also the primary route for the 2,000+ student Camas High School; regional parks at Lacamas, Round, and Fallen Leaf lakes; and the City’s North Shore Sub-Area.
- The corridor contains a commercial center.
- Over the last decade, multiple studies have been completed by the City regarding necessary improvements to the corridor to serve current residents and future development.
Timing
- We are in the early stages of the first project of the overall corridor improvements.
- The design process, which started with land surveying in Spring 2025, is not anticipated to be complete until 2029.
- The right of way process is anticipated to start in 2027.
- We will keep the community and project-area property and business owners apprised of the construction timeline, estimated to start as soon as 2029, dependent on funding.
Background
- To learn more about the first stage of this project, the Everett Street Corridor Analysis, please visit engagecamas.com/everett-street-corridor-analysis.
Ask a Question
Let us know what questions you have about the project!